• Betala enkelt med klarna!
  • 0515 - 460 80
  • Allt vi säljer, kan vi installera!
0
Varukorg
05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome
05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome
05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome - 2
05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome - 3

05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome

7 495 SEK
05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome med modellanpassad passform och modern ljussignatur.
Läs mer...
  • Betala i din egen takt med Klarna
  • Frågor eller fundering? Maila eller ring oss

Beskrivning

Art.nr: YAA-LMT-0358-2D31A

05-09 Ford Mustang 5th Gen (S-197 I) Pre-Facelift Vland I LED Dual Beam Projector med Reflector strålkastare Chrome från VLAND, framtagen för modellanpassad montering.

  • Fitment: VLAND LED headlights assembly for Ford Mustang 5th Gen (S-197 I) GT and V6 Model With Stock Halogen Headlights , Excluding GT500. Designed as a perfect replacement for your OE lights, they install the same way as factory units.
  • We have the LED Dual Beam 1 style in stock. They are the latest LED technology headlights features turn signals and dynamic activate lighting, choose the one you want best and place an order now!

  • Item Egenskaper:
    Color: Black
    StyleLED Dual Beam
    High/Low beam:LED (white) 3000LM*2
    Running Light (DRL): LED (white)
    Turn Signals: LED (Amber / With Sequential Indicators)
    Certification: SAE DOT

  • Förpackningen innehåller:
    One pair of head lamps include left and right side.

  • Warranty:
    Manufacturer warranty of one year from the date of purchase.

Produkten skickas från vårt europeiska leverantörslager. Normal leveranstid cirka 5–7 arbetsdagar.

Tillbaka till toppen